Bathroom

We had deliberately left the bathroom internal wall out to make it easier to work, but it had to go in sometime, but it started to look more bathroom like immediately. Needed a bit cutout for the toilet and a lip to match the lip on the shower tray. The blocked off pipe was for the toilet flush.

Finishing off with the cladding to make it look the part.