Day 2010/05/07
Got new fittings for water connections to the heater which worked perfectly. Liz finished making a table that was highly varnished and then fitted the fridge drawer. Also received the gas fittings so the pipes were connected. Ended up by cutting up the floor joists and ended the day fitting them with Sikaflex.
Liz made up the door and a panel for the front seat to cover the water tank and plumbing, just needs the sockets fitting. Also fitted the slide in bottle rack.